Charlotte County, FL Logo

941.743.1200
18500 Murdock Circle
Port Charlotte, FL 33948

Mobile Menu close icon
close search

Project Status Updates

Public Works Ian Projects

Hurricane Ian Projects

Learn about the ongoing Public Works and Facilities repair projects to county roads, right of ways and facilities from damage caused by Hurricane Ian.

Port Charlotte Beach Recreation Center News Image

Port Charlotte Beach Recreation Center Sales Tax Project

Last Updated: 03/12/2025 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Design Development

Design a new recreation center that will serve the current needs of rental venue for events, as well as community facilities for sailing and regatta events. 

Read More

Riverside Boat Ramp Replacement News Image

Riverside Boat Ramp Replacement

Last Updated: 03/12/2025 Category: Parks And Recreation Current Phase: Design Development

As part of the CMP, Community Services is conducting structural assessments on all piers, boardwalks, seawalls and boat ramps; through this assessment process it was bought to CS attention that Riverside Boat Ramp provides immediate safety concerns. During the site analysis the engineer determined the ramp could not be repaired in place; this project will be to design a replacement ramp that alleviates the safety issues. 

Read More

Sheriff Administration and Hardened 911 Facility News Image

Sheriff Administration and Hardened 911 Facility Sales Tax Project

Last Updated: 03/12/2025 Category: Sales Tax Funded Category: County Facilities Current Phase: Planning and Project Approval

Current facility is on airport-owned land with lease term up for renewal in 2023. Current building is a metal building repaired from damage in Hurrican Charley which is still suseptible to hurrican damage. It is not functionally laid out for current needs or growth. It is not designed or constructed to the needs of a modern law enforcement agency. E 911 will be colocated in the same facility.

Read More

Sheriff District 4 HQ, Training Facility and K9 Unit News Image

Sheriff District 4 HQ, Training Facility and K9 Unit Sales Tax Project

Last Updated: 03/12/2025 Category: County Facilities Category: Sales Tax Funded Current Phase: Construction

Construction of a replacement District 4 Headquarters Facility with a training component and K9 kennel/training area replacing existing facilites. The district office will utilize the prototype layout from District 1. The training building area will be incorporated into a single facility. The facility will be constructed at the Airport Road Annex site, replacing the existing Sheriff's Training, Supervisor of Election and old Transit Facility .

Read More

Supervisor of Elections Warehouse News Image

Supervisor of Elections Warehouse Sales Tax Project

Last Updated: 03/12/2025 Category: County Facilities Category: Sales Tax Funded Current Phase: Planning and Project Approval

Provide new 20,000 sqft +/- facility up to current code, meet needs of required climate controlledspace by the Supervisor of Elections. The facility shall include climate-controlled storage area for sensitive polling equipment and related supplies and support staff. Must be readily accessible and support staff needs for monitoring tabulation. Preferably house SOE administrative offices and serve public visitation in the same location. Includes 10,000 sqft for emergency managemnet and facilites. 

Read More

William R Gaines Jr. Veterans Memorial Park Phase II

William R Gaines Jr. Veterans Memorial Park Phase II Sales Tax Project

Last Updated: 03/12/2025 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Design Development

William R. Gaines Jr. Veterans Memorial Park phase II design and construction.

Read More

Flamingo/Edgewater Widening News Image

Flamingo/Edgewater Widening Sales Tax Project

Last Updated: 03/11/2025 Category: Roadway Current Phase: Design Development

Flamingo/Edgewater Widening

Read More

Weir Inspection and Repair Design

Weir Inspection and Repair Design

Last Updated: 03/07/2025 Category: Drainage Current Phase: Planning and Project Approval

The ELK 3.45, FOR 5.11 and a weir on the Pellam Waterway were found to be damaged.  The cause of the damage is not known.  An engineering firm has been retained to assess these three water control stuctures to determine the extent of the deficincies and then to prepare a cost effective plan that will successfully restore the structures so that they operate as designed.  

Read More

2024 Annual Paving Program

2024 Annual Paving Program

Last Updated: 03/04/2025 Category: Roadway Current Phase: Construction

The purpose of this project is to maintain the roadway system of Charlotte County in the following Districts: Greater Port Charlotte, Lemon Bay, South Burnt Store.

Read More

Delivering Exceptional Service

Questions? Issues?

Contact Us